Applications for Geopier and Impact Rammed Aggregate Pier elements beneath structures on poor soil sites.

Foundation Support

  • Unsurpassed settlement control
  • Increased soil bearing pressure
  • Normal spread footings
  • Eliminates pile caps and grade beams

Floor Slab Support

  • Provides a stiff engineered subgrade
  • Allows for slabs-on-grade, not structural slabs

Slope Stabilization

  • Creates a block of stiff, high friction angle material
  • Increases global factor of safety
  • In-house design using standard geotechnical apporaches

Tank Support

  • Reduces total and differential settlements
  • Increases bearing capacity
  • Commonly used by biofuel, industrial and agricultural clients

MSE Wall & Embankment Support

  • Increases factor of safety against global instability
  • Increases bearing capacity
  • Reduces settlements with a stiff construction platform
  • Reduces settlements to tolerable amounts

Utility Line Support

  • Provides uniform support for standard ductile iron and plastic pipes
  • Normal pipe bedding may be used

Railroad Support

  • Embankment global stability is increased

Uplift Control

  • Uplift anchors installed within Rammed Aggregate Pier to resist uplift
  • Economical, standard structural connections

Liquefaction Mitigation

  • Provides a stiff, non-liquefiable inclusion
  • Reduces magnitude of shear stresses on surrounding soils
  • Provides a conduit for rapid drainage of excess pore water pressures
Designing Rammed Aggregate Pier® Systems for Over 15 Years!